Jurong Engineering Co., Ltd.
Job content:
– Providing equipment rental services
– Providing technology support services for GCB testing
– Calibrating and testing field equipment for auxiliary boiler areas support and main steam pipes.
– Providing human resources for auxiliary boiler testing; Hydro tower/confined steam pipeline.
– Calibrate and verify field equipment for Hydro systems.
Marubeni Group
Job content:
– Perform loop testing for boiler No. 1 and No. 2.
– Provide human resources for commissioning
– Perform control function testing for boiler No. 2.
Company Hsing Sheng Engineering Ltd.
Job content:
– Test run the ash handling system and check the loop process
Foster Wheeler Services Co., Ltd.
Job content:
– Check the boiler performance for the furnace steam numbers 1 and 2